marcellusdrilling.com
Why Wait for a Cracker to be Built? Canadian Plant Cracking Now | Marcellus Drilling News
Although both WV and PA are in a race to build the northeast's first ethane cracker plant, such a plant will not be operational for at least another 4-5 years--if all goes well. The problem is, what do you do with all of the ethane being produced now in the Marcellus and Utica Shale? Ethane