Lordstown Gas-Powered Electric Plant Moves Up Construction Timeline

| | | | |

In April 2014, MDN told you about a proposal from Clean Energy Future to build an $800 million electric generation plant in Lordstown (Trumbull County), OH. The plant will be fired by natural gas from the Utica and Marcellus (see Clean Energy Plans NatGas Electric Generation Plant in Lordstown). At that time, the plan was to begin construction in December 2015 and complete the plant by the end of 2018. There was initial opposition to the plant because the site on Salt Springs Road would need to be re-zoned from residential to industrial. That didn’t go down well with the neighbors. Clean Energy Future has changed the plan to a different location. Those who once opposed the plant now embrace it and want it as a jobs-creator for the area. This is a happy story of industry and residents working together for a positive solution. It illustrates what happens when adults behave like adults…

Please Login to view this content. (Not a member? Join Today!)
You do not have permission to view the comments.