New NatGas-Fired Electric Plant Proposed for Chesapeake, VA

| | |

macquarieMacquarie Infrastructure has filed an application to build a new natural gas-fired electric generating plant in Chesapeake, Virginia, the state’s third most populous city, located near Norfolk. The facility, called Matex Virginia Power, would produce 1,400 megawatts of electricity by using three gas combustion turbines and one steam turbine. It’s not (yet) known how the new plant will get its gas, although Dominion’s planned $5 billion, 550-mile long Atlantic Coast Pipeline (ACP) project is scheduled to have a branch going to Chesapeake. It’s not much of a stretch to think that ACP will feed this new plant, bringing Marcellus/Utica gas from the north to the plant. Here’s the good news, followed by reaction from environmental Nazis that oppose it…

Please Login to view this content. (Not a member? Join Today!)
You do not have permission to view the comments.