FERC Issues Favorable Final EIS for Mountaineer/Gulf XPress Pipes

| | | | | | |

In February the Federal Energy Regulatory Commission (FERC) issued a draft final environmental impact statement (DEIS) for two important pipeline upgrades to carry more Marcellus/Utica gas to southern markets–Mountaineer XPress and Gulf XPress (see FERC Issues Favorable Enviro Report for Mountaineer & Gulf XPress). It’s always a good sign when you get a favorable DEIS, because it almost always means you’ll get a favorable final EIS. MDN previously reported on Mountaineer XPress, which includes 165 miles of new pipeline with approximately 2.7 billion cubic feet (Bcf) per day of transportation capacity from existing and future points of receipt along or near the Columbia pipeline system–most of it located in West Virginia (see Details on Columbia Pipeline Mountaineer XPress Pipeline Project). Gulf XPress consists of constructing seven new midpoint compressor stations along the existing Columbia pipeline system in Kentucky, Tennessee and Mississippi, with the aim of moving an additional 875 million cubic feet (MMcf) of Marcellus/Utica gas per day southward, to the Gulf Coast region. Good news. FERC issued a favorable final EIS on Friday…

Please Login to view this content. (Not a member? Join Today!)
You do not have permission to view the comments.