Lansing, MI to Build New 250 MW Gas-Fired Electric Plant

| | |

The Lansing, Michigan Board of Water & Light (BWL) announced yesterday it will build a brand new $500 million natural gas-fired power plant. The new plant will generate 250 megawatts of electricity, create 1,200 construction jobs, and go online in 2021. The plant will be located at the Erickson Power Station facility in Delta Township as part of its Lansing Energy Tomorrow plan, replacing (and retiring) BWL’s coal-fired Eckert plant at that location. Out with old, in with the new. Why report about a new gas-fired power plant in Michigan here on MDN? Because the mighty Rover Pipeline, which is due to be completed and online by the end of March 2018, terminates very close to Lansing (see the map below). While we’ve not spotted any stories indicating where the gas will come from to feed the new Lansing plant, we’d wager a lot of money that at least some–perhaps most/all–of the gas to feed the plant will come from the Utica/Marcellus, gas hitching a ride along the Rover Pipeline. The nuts from the Sierra Club are ecstatic that BWL will close the coal plant, but opposed to building a clean-burning natural gas plant. Some people are never happy…

Please Login to view this content. (Not a member? Join Today!)
You do not have permission to view the comments.