Range, CNX Look for Alternatives to ME1 Pipe Following Shutdown

| | | | | | | |

MDN reported yesterday that due to underground horizontal direction drilling (HDD) in Chester County, PA (near Philadelphia) for the Mariner East 2 (ME2) Pipeline project, a third sinkhole had developed (see PA PUC Shuts Down Mariner 1 Pipeline Due to Mariner 2 Sinkhole). ME2 is being built close to the existing Mariner East 1 (ME1) pipeline. The sinkhole exposed a portion of the ME1 pipeline to the open air. Not a good situation, which is why the state Public Utility Commission has temporarily shut down the propane and ethane flowing through ME1. The shutdown is for 10-14 days. Problem is, both Range Resources and CNX Gas pump propane and ethane through ME1. With the shutdown, both companies are “scrambling” to find alternative means to get their NGLs to market…

Please Login to view this content. (Not a member? Join Today!)
You do not have permission to view the comments.