“Growing” Opposition to Shell Ethane Cracker Pipe from One Source

| | | | |

In June, Shell said that they plan to build their Falcon ethane pipeline in 2019 (see Shell Says Falcon Ethane Pipeline to Get Built in 2019). The pipeline won’t actually flow ethane to the Shell cracker in Monaca (Beaver County), PA until 2020 at the earliest–because the cracker plant itself won’t go online until 2020 at the earliest. The 97-mile, two-legged Falcon Pipeline is interesting because Shell didn’t use eminent domain. Shell negotiated with every landowner and got them all to sign on the dotted line. Yet we’re now hearing from Pittsburgh media that there is “growing” opposition to the project. Unless you’re a landowner with the right to stop it, or the Sierra Club with billions in the bank to launch frivolous lawsuits, there is no stopping this project, “growing opposition” or not. When you dig into the news, you will find the “growing” opposition seems to be coming from a single source–the Ambridge Water Authority.

Please Login to view this content. (Not a member? Join Today!)
You do not have permission to view the comments.