Antero 2017: Big Swing from Red into Black, 9 Long Marc. Laterals
Lots of news coming out of Antero Resources, one of the Marcellus/Utica's biggest (and best) drillers. Antero issued its fourth quarter and full year 2017 update, along with a statement about the company's proved reserves, earlier this week. Perhaps the biggest news is that after losing $849 million in 2016, net income for Antero in 2017 was $615 million--a $1.4 billion swing (to the good) over the course of a single year! Average daily production in 2017 was 2.25 billion cubic feet equivalent per day (Bcfe/d)--a 22% increase over 2016. Zooming in on just the fourth quarter, Antero completed and placed on line 28 Marcellus and 10 Utica wells. Antero said they are getting into long laterals. Of the Marcellus wells drilled in 4Q17, nine had laterals over 12,000 feet, with two of those exceeding 14,000 feet in length (over 2.5 miles horizontally underground). Even with long laterals, Antero decreased the average number of days it takes to drill a well--from 15 to 12 (20% less). They also upped the amount of sand they use in fracking by 23%--to over 2,000 pounds of sand per foot. At the end of 2017, Antero estimates it had 17.3 trillion cubic feet equivalent of natural gas sitting in the ground that can be extracted using today's technology at today's prices ("proved reserves"). That 17.3 Tcfe is 12% higher than at the end of 2016. Below is the whole enchilada--two updates from Antero, excerpts from the analyst phone call, and the latest and greatest PowerPoint presentation...
To view this content, log into your member account. (Not a member? Join Today!)