M-U Transload Facility in OH Getting Gas-Fired Power Plant 2021
In January 2018 MDN brought you news from the new owners of what is now called the Long Ridge Energy Terminal in Monroe County, OH (transloading facility) that they were moving forward "quickly" with plans to build a 485-megawatt Utica gas-fired electric plant. The plan was to have it online and running in 2020. That's now been pushed back to late 2021.
To view this content, log into your member account. (Not a member? Join Today!)