Utica Gas Power Plant on Ohio River Returns to Service After Outage

| | |

The Long Ridge Energy Terminal, host to a Utica shale gas-fired power plant that went online in November 2021, scheduled brief downtime for routine maintenance during the fourth quarter of 2022. But when the techs started to analyze the equipment, they discovered a problem, turning a couple of weeks of downtime into more than a month.

Please Login to view this content. (Not a member? Join Today!)
You do not have permission to view the comments.