Shell Challenges Venture Global Arbitration Loss in NY Court

| | | | |
Venture Global’s Calcasieu Pass (CP) LNG export facility in Louisiana began operations in March 2022 (see Calcasieu Pass LNG Loads Inaugural Cargo; Sabine Pass LNG Expands). Typically, a new LNG facility will load and ship several (maybe two or three) cargoes to “work out the kinks” and ensure everything is working as advertised. Venture Global, using loopholes in its signed contracts, maintained that they were working out the kinks long after it began shipping. After hundreds of cargoes were shipped, CP’s customers were still not receiving their contracted (at lower prices) shipments. Shell, along with several other customers, sued (see Shell, Edison, BP File for Arbitration Against Venture Global LNG). Shell lost its arbitration case, but two months later, BP won its arbitration case. Shell is now appealing the rejected case.

To view this content, log into your member account. (Not a member? Join Today!)