Shell Paying $80M to Clean Up PA Site for Ethane Cracker Plant

| | | | | |

positive signShell continues to work (and spend money) on a site in Beaver County, Pennsylvania that will one day hopefully be the home of an ethane cracker plant. The most recent positive sign that Shell will move forward with the project is that they are in the process of building a bridge over a highway for trucks to access the site as they work on site preparation and building (see Shell Begins Building Bridge to PA Cracker Plant Site). The newest evidence that Shell will move forward with the project is their plan to deal with leftover contamination at the site. The site is a former zinc smelter and there are high levels of very nasty stuff in the soil at the site, including lead, arsenic, cadmium and mercury. Shell plans to cover the site, locking in the nasty stuff–a project that will cost them $80 million and take two years to complete…

Please Login to view this content. (Not a member? Join Today!)
You do not have permission to view the comments.