Letter Writing War Erupts Over Jessup, PA Gas-Fired Power Plant

| | | |

An interesting back and forth in letters to the editor of the Democrat-run Scranton Times-Tribune over the proposed electric generating plant in Jessup, PA. As MDN has previously chronicled, Chicago-based Invenergy hopes to build what will be the largest (to date) electric generating plant in the state of Pennsylvania powered by natural gas (see Public Hearing on NEPA Proposed Marcellus-Powered Electric Plant). Invenergy hopes to build the 1300-megawatt plant in the borough of Jessup (Lackawanna County), near Scranton. In very basic and simple terms, local Democrat anti-drillers (who hate fossil fuels of any kind) are against the plant, and local clear-thinking Republicans are in favor of this clean-burning, jobs-producing, economy-stimulating project. Recently a ginned-up “controversy” over the plant took to the editorial pages of the Times-Tribune. Here’s the (so far) back and forth between two antis and one pro…

Please Login to view this content. (Not a member? Join Today!)
You do not have permission to view the comments.