Mountaineer Xpress Pipe Breaks Ground in WV on $100M Compressor
Earlier this week TransCanada (i.e. Columbia Pipeline) broke ground for a new $100 million compressor station that will flow gas through the Mountaineer XPress Pipeline. MDN previously told you that at the end of December the Federal Energy Regulatory Commission (FERC) issued a final approval for Mountaineer (see Leach XPress Goes Online; FERC Approves Mountaineer & Gulf XPress). The $2 billion Mountaineer XPress will build ~170 miles of new pipeline to flow 2.7 billion cubic feet (Bcf) per day of natural gas from existing and future points of receipt along or near the Columbia pipeline system–most of it located in West Virginia (see Details on Columbia Pipeline Mountaineer XPress Pipeline Project). At 2.7 Bcf/d, Mountaineer XPress is the second largest (by volume) new pipeline project for the Marcellus/Utica region--second only to Rover’s 3.25 Bcf/d pipeline. It is a big and important project. On Tuesday, even though the temps were frigid and the snow was flying, Calhoun County commissioners along with reps from TransCanada broke ground on an important new compressor station being built to flow gas through Mountaineer XPress. Calhoun has not seen any shale drilling, although neighboring Ritchie County (to the north) and Gilmer County (to the east) have. Mountaineer XPress and this compressor station are helping Calhoun participate economically in the shale miracle, which Calhoun's commissioners expressed thanks for...
To view this content, log into your member account. (Not a member? Join Today!)