Cove Point LNG Offline for Annual Maintenance Until Mid-October
Each fall in the September/October timeframe, Cove Point LNG shuts down for a few weeks (typically around three weeks) for annual maintenance. That time has arrived. According to a notice posted on the Berkshire Hathaway Energy Informational Postings website, reductions in flows to the Cove Point facility will happen between Monday, September 15, and Friday, October 10 (a whole month). Having said that, feedgas flows will not be zero during all of that period, but will be significantly reduced.To view this content, log into your member account. (Not a member? Join Today!)
