2nd Bomb Threat Stops Construction at Natrium, WV NGL Plant
Just two days ago MDN told you that the Blueracer Midstream natural gas liquids (NGLs) processing plant being built in Natrium, WV is now several months behind schedule and not due to go online until later this spring (see Natrium, WV NGL Plant Behind Schedule, Will Open “Late Spring”). Back in February, the same Natrium plant had a bomb threat that stopped construction and caused an evacuation of 500 workers for several hours (see Bomb Threat at Natrium, WV NGL Plant Doesn’t Slow Construction). At the time, it was thought perhaps the bomb threat did not specifically target the NGL plant because the previous day a bomb threat was called at a different nearby WV Route 2 location, not related to the natural gas industry.
But now? We’re not so sure. Yesterday a second bomb threat was made against the Natirum facility, causing the evacuation of 700 construction workers, shutting down work for another several hours. The head of the WV Oil and Natural Gas Association is calling it a case of “domestic terrorism” and a crime:
To view this content, log into your member account. (Not a member? Join Today!)