Rover Pipe Wants to Flow Extra 175 MMcf/d – No Extra Cost/Equipment

| | | | | |

The $4.2 billion, 713-mile Rover Pipeline system that flows Marcellus/Utica natural gas from western PA and eastern OH all the way to Canada, placed the final two pieces of the system online in November 2018 (see FERC OKs Final 2 Rover Pipeline Laterals – Now 100% Online). The mainline Rover pipeline flows 3.25 billion cubic feet per day (Bcf/d). Rover wants to expand that capacity without any new equipment and without any additional cost. How do they plan to pull that rabbit out of their hat?

Please Login to view this content. (Not a member? Join Today!)
You do not have permission to view the comments.