The $4.2 billion, 713-mile Rover Pipeline system that flows Marcellus/Utica natural gas from western PA and eastern OH all the way to Canada, placed the final two pieces of the system online in November 2018 (see FERC OKs Final 2 Rover Pipeline Laterals – Now 100% Online). The mainline Rover pipeline flows 3.25 billion cubic feet per day (Bcf/d). Rover wants to expand that capacity without any new equipment and without any additional cost. How do they plan to pull that rabbit out of their hat?