TC Energy Asks FERC for More Time to Build Potomac Pipeline

| | | | | |

TC Energy’s Columbia Gas Transmission subsidiary has not given up on building a 3.37-mile, 8-inch pipeline under the Potomac River. The pipeline, from Maryland on one side of the river to West Virginia on the other side, will be built to feed a larger pipeline project from Mountaineer Gas called the Eastern Panhandle Expansion. The crazy anti-fossil fuel loons who run Maryland are trying to block the project. Columbia is asking the Federal Energy Regulatory Commission (FERC) for more time to get it built because of Maryland’s interference.

Please Login to view this content. (Not a member? Join Today!)
You do not have permission to view the comments.