SWPA Beech Hollow Power Plant Begins Construction – Radicals Oppose
Unknown to us, the Beech Hollow Power Plant in Robinson Township (Washington County), PA broke ground on construction for a 1,000-megawatt Marcellus-fired project last fall when they began to pour concrete. However, construction has stopped. The builder, Robinson Power Company LLC, wants to resume construction but is now caught up in a controversy over issued and withdrawn permit applications. The leftwing radicals at the Clean Air Council (located on the other side of the state, in Philadelphia) are challenging a permit by the DEP to allow Robinson Power to resume construction.
To view this content, log into your member account. (Not a member? Join Today!)