MVP Cuts Gas Flows for Maintenance 2 Mos. After Launching

| | |
A section of the recently completed 303-mile Mountain Valley Pipeline (MVP) was shut down on Tuesday for "pigging" operations and maintenance. Certain sections of MVP have dropped to zero flows, while other sections have dropped to drastically lower flows. We'll ask the questions no one else will: Why the heck is MVP shutting down a section of a pipeline completed less than two months ago? Is there a concern? And, is it normal for a brand new pipeline that came online within the past two months to experience an outage like this for pigging maintenance?

To view this content, log into your member account. (Not a member? Join Today!)