MVP Water Pressure Test Rupture Mystery Solved: Defective Weld

| | | | | | |
On May 1, a section of the 303-mile Mountain Valley Pipeline (MVP) ruptured during final pressure testing in Roanoke County, Virginia (see Section of MVP Ruptures Near Roanoke Under Water Pressure Test). An independent metallurgical test identified a defective weld in an elbow joint as a cause of the failure. No internal or external corrosion was detected on the section, which was installed in 2018.

To view this content, log into your member account. (Not a member? Join Today!)