FERC Approves Mountaineer XPress Pipe Rate Increase
We spotted a story that contains information we don't fully understand. Columbia Gas Transmission is currently building the Mountaineer XPress Pipeline, a $2 billion, 170-mile pipeline that will flow 2.7 billion cubic feet (Bcf) per day of natural gas from existing and future points of receipt along or near the Columbia pipeline system--most of it located in West Virginia (see Details on Columbia Pipeline Mountaineer XPress Pipeline Project). At 2.7 Bcf/d, Mountaineer XPress is the second largest (by volume) new pipeline project for the Marcellus/Utica region--second only to Rover’s 3.25 Bcf/d pipeline. It is a big and important project. When Columbia (aka TransCanada) filed the original application, approved by the Federal Energy Regulatory Commission, they sought permission to charge $9.827 per dekatherm (one dekatherm is equivalent to one thousand cubic feet, or 1 Mcf) to flow gas along the pipeline. Put another way, shippers without a contract who want to ship along the pipeline will pay $9.83/Mcf to ship gas. To view this content, log into your member account. (Not a member? Join Today!)
