More Clarity on Status of Mountaineer NGL Storage Facility in OH
In May, MDN conveyed the news that it appears Mountaineer NGL Storage, which wants to build a new underground NGL storage facility in Monroe County, Ohio, near Clarington, along the Ohio River (see New Company Announces Open Season for NGL Storage in Ohio Utica), had, according to the story we read, begun construction (see Mountaineer NGL Storage Facility in OH Under Construction). Based on a later article, we stated that our older story was in error (see Mountaineer NGL Storage Facility in OH Not (Yet) Under Construction). In October 2016, Mountaineer drilled and completed a test well in the salt formation. But in April of this year, Mountaineer said construction had not yet begun due to problems with red tape (see Mountaineer NGL Storage in Monroe County, OH Caught in Red Tape). An interview with a company official said nobody has (as yet) signed on the dotted line to use the facility, and that is the holdup now. Which has been, more or less, confirmed at the recent Appalachian Storage Hub conference, held last week in Canonsburg, PA. After reading an account of Mountaineer’s comments at the event, we now believe we have a fuller, even more accurate picture. The situation is this: Yes, they need customers to sign up to use the facility (minimum of 1 million barrels of storage would get it going). In addition, Mountaineer still needs to build a 3.25 million barrel brine pond, used to pump out the stored NGLs. Mountaineer is still waiting for a clearance from the Ohio Dept. of Natural Resources to build the pond, likely to take a few more months. So they need customers, and they need more regulatory approvals…
Read More “More Clarity on Status of Mountaineer NGL Storage Facility in OH”

In May MDN conveyed the news that it appears Mountaineer NGL Storage, which wants to build a new underground NGL storage facility in Monroe County, Ohio, near Clarington, along the Ohio River (see
We spotted a story that makes reference to an ethane storage facility currently under construction in Monroe County, OH. That got our attention. The story said that Energy Storage Ventures has plans to begin storing ethane in the underground facility by the end of 2018. Who’s Energy Storage Ventures? We went looking and discovered it’s another name for the Mountaineer NGL Storage project that we’ve been covering. In April 2016, Mountaineer NGL Storage (aka Energy Storage Ventures) announced an open season for a new underground NGL storage facility in Monroe County, Ohio, near Clarington, along the Ohio River (see
After 10 long years, the Bureau of Land Management (BLM) auctioned 719 acres in Ohio’s Wayne National Forest (WNF) last December (see
Early Sunday morning there was a low-level earthquake in Monroe County, OH–that literally nobody felt–but was picked up on seismic monitors by the U.S. Geological Survey. There was, according to the Ohio Dept. of Natural Resources (ODNR) one fracking operation “near” the earthquake that ODNR shut down within an hour after the event–out of an abundance of caution. Immediately several radical anti-drilling groups, including the Ohio Environmental Council and the Sierra Club, jumped on the news and declared fracking unsafe and too risky in the nearby Wayne National Forest. With zero proof that it was tied to either fracking or wastewater injection wells. Here’s the news, and the way the news is being distorted by antis…
A few weeks ago MDN reported on an upcoming meeting (to be held March 27) in Monroe County, OH to announce a new project to build a 485-megawatt Utica gas-fired electric plant (see
Last week the Bureau of Land Management (BLM) auctioned off a second round of properties located in Wayne National Forest (WNF), in Ohio (see
After 10 loooooong years of waiting, the Bureau of Land Management (BLM) finally auctioned its first round of property leases for shale drilling in Wayne National Forest (WNF)–located in Ohio (see
[NOTE: In the original version of this post, MDN incorrectly referred to the name as Center Point Terminal. It is, in fact, Center Port Terminal. Sorry!] One of MDN’s sharp subscribers emailed us with an exciting tip. On March 27 a public meeting will be held in Woodsfield, Ohio (Monroe County) about building a 485 megawatt gas-fired power plant–to be built on twenty acres of the 200 acre former Ormet site, now known as Center Port Terminal. That much we have been able to confirm. Our tipster also speculated this new power plant may be used to provide electricity to an ethane cracker. We have not, so far, been able to verify the cracker rumor. Here is what we do, and don’t, know about this new power plant project coming in Monroe County…
In December the Bureau of Land Management (BLM) proceeded with an online auction for BLM-controlled land in Ohio’s Wayne National Forest (see
A couple of weeks ago four companies won bids on 17 parcels totaling 719 acres of federal land (for Utica Shale drilling) in the Ohio Wayne National Forest (see
Two members of Eclipse Resources’ top management team are playing musical chairs as part of the company’s plan to “accelerate growth” in 2017. Tom Liberatore, currently executive VP and COO is dropping the COO title and becoming executive VP of corporate development and geosciences. Meanwhile, Oleg Tolmachev, currently senior VP of drilling and completions is becoming executive VP and COO. Tolmachev’s star is clearly rising and he is now the man running the Utica/Marcellus drilling program for the company. In the same press release, the company said it has now completed and brought online five Utica wells in Monroe County, OH. The wells are the first dry gas Utica wells to use Eclipse’s new “Gen-3” completion design. What is Gen-3? And what does the musical chairs at Eclipse have to do with Gen-3?…
Eclipse Resources, a Marcellus/Utica pure play driller headquartered in State College, PA that drills mostly in Ohio, announced yesterday they sold 9,900 net acres in eastern Noble County and western Monroe County, OH for $63.8 million to an undisclosed buyer. That works out to be $6,444 per acre. The assets are in areas that are (currently) undeveloped, according to the company, and not in the “core” of where Eclipse wants to drill. Here’s the company announcement…
Gulfport Energy reports they have just snagged another 12,600 net undeveloped Utica acres located dry gas window of northern Monroe County, Ohio for $87 million. When you run the math, that works out to be $6,905 per acre–far less than the recent $10,000/acre prices we’ve seen. Half of the acreage is “held by production,” meaning wells have either been drilled or are already producing. Analysts figure the land, which is located next to land already leased by Gulfport, will yield something like 105 new wells for the company. Gulfport is head over heels in love with the Utica and plans, as we noted in November, to run an average of six drilling rigs in the Utica in 2017 (see 