Integrated Lithium Production Plant Coming to PA Marcellus in 2026
A Boston-based company, Gradiant, issued a press release to make a really big, really important announcement: The company’s lithium business, called alkaLi, will design, build, own, and operate a commercial lithium production facility in the Marcellus Shale Formation of Pennsylvania beginning in early 2026. The unidentified site, which is already built and in testing, will be “the world’s first to Extract, Concentrate, and Convert (EC²) lithium in a fully integrated, end-to-end process from oilfield produced water,” according to the announcement. The company stated that this facility in the PA Marcellus “could supply 50% of U.S. lithium demand.” Wow! UPDATE: We now have a fix on the location of this facility thanks to a sharp MDN reader. Read More “Integrated Lithium Production Plant Coming to PA Marcellus in 2026”

Penneco Environmental Solutions wants to build a second wastewater injection well in Plum Borough (Allegheny County), PA, next to an existing injection well. Penneco’s first wastewater injection well in Plum finally opened for business in mid-2021, overcoming all sorts of smears, slanders, and lawsuits by the enviro-left (see
Two conventional oil producers in Southeast Ohio say dozens of their wells have been flooded with industrial waste (brine) from the fracking industry. They claim that nearby injection wells that handle frack waste/brine are leaking. State regulators agree that injection wells, at least at some locations, are leaking. Not only have these leaks (if true) affected oil wells, but there’s a concern they may be contaminating area water wells.
One of the significant stories of 2024 in the Ohio Utica was about Austin Master Services (AMS), a radiological waste management solutions company in Martins Ferry, Ohio, that handles fracking waste by transporting it for disposal. AMS ran into trouble when it ran out of money. The Martins Ferry facility in Belmont County, where waste is temporarily stored, had exceeded its permitted maximum of 600 tons of stored waste, resulting in a violation of its permit. The Ohio Attorney General’s office filed a lawsuit against the company in March 2024 to force compliance and to force the cleanup of the facility. The Ohio Department of Natural Resources (ODNR) stepped in to do the cleanup work. As of today, cleaning and testing are done. 

We have an important update to share. On Feb. 19, MDN published a post about a Catalyst Energy wastewater injection well in Keating Township, McKean County, PA (see
Penneco Environmental Solutions wants to build a second wastewater injection well in Plum Borough (Allegheny County), PA, next to an existing injection well. Penneco’s first wastewater injection well in Plum finally opened for business in mid-2021, overcoming all sorts of smears, slanders, and lawsuits by the enviro-left (see
Here’s an interesting lawsuit that never appeared on our radar. It involves a lease in Fayette County, West Virginia, and the right to establish an injection well in an old conventional well on the leased property. The party leasing and using the old injection well, Webb Construction, was later sued by the party leasing out the property, North Hills Group, after new board members over at North Hills. The lawsuit accused Webb of improperly using the old well as an injection well without first trying to see if the well could be rejuvenated as a productive gas well and building a pipeline to the well that leaked wastewater on North Hill’s property. A Fayette Circuit Court jury in 2022 found in favor of Webb and against North Hills, dismissing all claims against Webb. North Hills asked the judge to grant a new trial to overturn the jury verdict, which the judge did. North Hills won in the new trial.
We’ve been tracking a story that we consider an ongoing tragedy for nearly a decade. American Water Management Services (AWMS) owns a wastewater injection well in Trumbull County, Ohio, that supposedly caused a low-level earthquake (that nobody could feel) in 2014. Actually, there are two injection wells located at the site, both operated by AWMS. They were both “temporarily” shut down by the Ohio Dept. of Natural Resources following the quake nobody could feel (see 
The federal Environmental Protection Agency (EPA) announced yesterday that it had issued an oil and gas wastewater injection well permit to Seneca Resources to continue operating well #38268 in Highland Township, Elk County. The EPA permit allows Seneca to inject up to 75,000 barrels monthly (3.125 million gallons). This well is one of two injection wells Seneca operates at that location. It was a long road for Seneca to get these two wells online, and a welcomed development that the EPA is extending the well’s operating permit.
One of the significant stories of 2024 in the Ohio Utica was about Austin Master Services (AMS), a radiological waste management solutions company in Martins Ferry (Belmont County), Ohio, that handles fracking waste (trucks it for disposal). AMS ran into trouble when it ran out of money. The Martins Ferry facility where waste is temporarily stored went from a permitted maximum of 600 tons of stored waste to over 10,000 tons, in violation of its permit. The Ohio Attorney General’s office filed a lawsuit against the company in March to force compliance. Local newspaper The Times Leader, in doing a Top 10 stories of the year, provides an update on AMS and where things stand with the cleanup.