New Lithium-from-Brine Plant Coming to Northeast Pa. Marcellus
A new player is entering the Marcellus looking to extract lithium from shale brine (wastewater), and it’s doing it in a big way in Susquehanna County in the northeastern corner of Pennsylvania. Avonlea Lithium Corporation, a subsidiary of Vancouver-based Rain City Resources Inc., will provide its newly-tested technology to Kendra II, based in Springville, PA, to provide an on-site plant to extract lithium from Marcellus brine. The new plant will be set up and operating by April 2025. Read More “New Lithium-from-Brine Plant Coming to Northeast Pa. Marcellus”

The federal Environmental Protection Agency (EPA) announced yesterday that it had issued an oil and gas wastewater injection well permit to Seneca Resources to continue operating well #38268 in Highland Township, Elk County. The EPA permit allows Seneca to inject up to 75,000 barrels monthly (3.125 million gallons). This well is one of two injection wells Seneca operates at that location. It was a long road for Seneca to get these two wells online, and a welcomed development that the EPA is extending the well’s operating permit.
One of the significant stories of 2024 in the Ohio Utica was about Austin Master Services (AMS), a radiological waste management solutions company in Martins Ferry (Belmont County), Ohio, that handles fracking waste (trucks it for disposal). AMS ran into trouble when it ran out of money. The Martins Ferry facility where waste is temporarily stored went from a permitted maximum of 600 tons of stored waste to over 10,000 tons, in violation of its permit. The Ohio Attorney General’s office filed a lawsuit against the company in March to force compliance. Local newspaper The Times Leader, in doing a Top 10 stories of the year, provides an update on AMS and where things stand with the cleanup.
In January 2024, MDN brought you the news that the Pennsylvania Dept. of Environmental Protection (DEP) approved a plan by Catalyst Energy to convert an existing conventional gas production well on Route 646 in Cyclone (Keating Township, McKean County, PA) into a shale wastewater injection well (see
Penneco Environmental Solutions wants to build a second wastewater injection well in Plum Borough (Allegheny County), PA, next to an existing injection well. Penneco’s first wastewater injection well in Plum finally opened for business in mid-2021, overcoming all sorts of smears, slanders, and lawsuits by the enviro-left (see
We’ve discussed shale wastewater, sometimes called brine or “produced water,” many times over the years. When drilling an oil or gas well deep in the earth, the hole releases naturally occurring water from the depths (far, far below the surface water table) for years after the well is drilled. The water coming out has a LOT of minerals, sometimes mildly radioactive, and is usually called either brine (meaning salty) or produced water. Traditionally, there are two ways to handle all of that water coming out of the ground: (1) recycle it and reuse it for more oil and gas drilling, or (2) pump it back down into the ground from whence it came via an injection well. Ohio University (in Athens, OH) has just won a grant from the U.S. Department of Energy to study how produced water can be cleaned up and used outside the oil and gas sector.
Upper Burrell (Westmoreland County, PA) town supervisors have historically been receptive (or at least tolerant) to the Marcellus Shale industry that has so blessed their town and Westmoreland County (
A Pennsylvania Department of Environmental Protection (DEP) inspector showed up at Stonehaven Energy’s Class IID “Latshaw 9” oil and gas wastewater injection well in Cranberry Township, Venango County, on Nov. 27 for a routine inspection. He found the well is not in use and hasn’t been in use since March 2023. The well was inspected in March 2024, yet no violations were issued at that time. However, the inspector tagged the well with a violation on Nov. 27, claiming the well had been “abandoned.”
In July, the Ohio Dept. of Natural Resources (ODNR) opened up the shuttered Austin Master Services (AMS) radiological waste management solutions company in Martins Ferry (Belmont County), Ohio, to begin cleanup work at the facility (see
On May 30, 2023, a fire and subsequent explosion damaged an above-ground storage tank and the upper process building at the already-closed Fairmont Brine Processing plant in Fairmont, WV (see 
In January, MDN brought you the news that the Pennsylvania Dept. of Environmental Protection (DEP) approved a plan by Catalyst Energy to convert an existing conventional gas production well on Route 646 in Cyclone (Keating Township, McKean County, PA) into a shale wastewater injection well (see
It’s good to revisit the basics from time to time. When drilling a shale oil or gas well, each well produces “brine,” a super-salty (minerally) water from the depths that keeps flowing long after the well is drilled and is online. This is not surface water; fresh water found down to about 300 feet. This is another layer of water thousands of feet below the surface. Disposing of brine can be a problem given the minerals in it. A lot of brine is recycled and used again for new drilling and fracking. But what happens when drilling slows down? The water continues to flow out of existing wells and needs proper disposal. Researchers at Lehigh University in Bethlehem, PA, may have a new solution.
In January, MDN brought you the news that the Pennsylvania Dept. of Environmental Protection (DEP) approved a plan by Catalyst Energy to convert an existing conventional gas production well on Route 646 in Cyclone (Keating Township in McKean County, PA) into a shale wastewater injection well (see
In late July, the Ohio Dept. of Natural Resources (ODNR) opened up the shuttered Austin Master Services (AMS) radiological waste management solutions company in Martins Ferry (Belmont County), Ohio, to begin cleanup work at the facility (see
We spotted a report about an aboveground pipeline that flows shale wastewater that sprung a leak and released an estimated 12,600 gallons of brine (salty water from deep below the surface) on the ground in Gilmore Township, Greene County, PA. The pipeline is owned by EQM Gathering, another name for Equitrans Midstream, which is now owned by EQT. The leaking pipeline connects to the Trust Well Site owned by EQT. It sure sounds like a serious spill (12,600 gallons) with the potential to contaminate local water supplies—until you dig into the state Dept. of Environmental Protection’s (DEP) report on the incident.