Warren OH Fracking Wastewater Treatment Plant Future in Doubt
The future of wastewater treatment plant in Warren (Trumbull County), Ohio that handles fracking wastewater from Marcellus Shale drilling is now in doubt. The state attorney general has ruled that the permit granted to the Patriot Water Treatment plant in Warren was granted illegally.
Read More “Warren OH Fracking Wastewater Treatment Plant Future in Doubt”

The U.S. Environmental Protection Agency (EPA) is signaling their intent to continue overreaching their authority by regulating oil and gas drilling in the U.S., violating states’ constitutional rights to do so themselves. The EPA’s “back door” way of regulating hydraulic fracturing (buying them time while they try to regulate it by the front door with their multi-year study of the process), is by controlling the disposal of wastewater produced during fracking. From the EPA’s press release yesterday:
Texas-based GreenHunter Energy, Inc. announced they’ve purchased acreage in West Virginia where they will establish a facility to treat and dispose of fracking wastewater. Part of GreenHunter’s plan includes disposing wastewater using an existing injection well with plans for additional injection wells. The press release (in full below) does not mention the exact location for the new facility and injection wells.
The U.S. Department of Energy is funding a number of research projects to help find ways to extract more energy from unconventional oil and gas resources while reducing environmental risks. The DOE grants amount to $12.4 million.