Federal Court Stops Works on Some (All?) of Atlantic Coast Pipe
In a pattern that has become obvious, and disturbing, the radicalized Sierra Club has once again prevailed in shutting down work on a second mammoth pipeline project–Dominion’s Atlantic Coast Pipeline (ACP)–by concentrating their legal arguments at one small, specific point of the project. This happened with Mountain Valley Pipeline (MVP). As we reported yesterday, the Federal Energy Regulatory Commission (FERC) told MVP to stop work on the entire project, at least for now (see FERC Shuts Down ALL Work on Mountain Valley Pipeline in WV, VA). The Sierra Club convinced the without-experience-in-the-oil-and-gas-industry judges of the federal Fourth Circuit Court of Appeals to overturn permits granted by the U.S. Forest Service (USFS) and Bureau of Land Management (BLM) to build MVP across 3.5 miles of Jefferson National Forest, on the border of WV and VA. This time, with ACP, the Sierra Club convinced the Fourth Circuit to overturn permits granted by the U.S. Fish and Wildlife Service (FWS) and the U.S. National Park Service (NPS) granted to ACP to cross the Blue Ridge Parkway. However, the rolled-back permits affect more of ACP than MVP–about 100 miles of work out of 600+ miles. The court, in rolling back ACP’s permits all but told FERC they need to shut down work on the entire project until this matter is resolved. The court can’t order FERC to do so, but they strongly cautioned FERC that they should do so. Since FERC stopped work on MVP, it stands to reason they will do it with ACP too. So lightening has now struck twice, and it’s not good. Dominion maintains they will continue to build ACP except for those areas where the Fourth Circuit has rolled back permits. In other words, they’ll keep building it in North Carolina and some locations in WV. All eyes are now on FERC. We hate to say this, but our guess is that FERC will shut down the entire ACP project, for now. It’s virtually the same scenario as MVP which FERC elected to shut down. Why would this project be any different?…
Read More “Federal Court Stops Works on Some (All?) of Atlantic Coast Pipe”

Andrew Cuomo is a tinhorn dictator who must be stopped (politically). NOW. Competitive Power Ventures (CPV) Valley Energy Center is a $900 million, 680-megawatt natural gas-fired electric generating plant in Orange County, NY (near the Hudson River). The plant is fully built, and the Millennium pipeline now flows Marcellus gas to it (see
In 2017, Mountaineer Gas launched the Eastern Panhandle Expansion pipeline project–a project to deliver natural gas via local distribution channels to a new industrial facility in Berkeley County, WV, and to provide gas to other local businesses and residents in the Tri-State area. Mountaineer’s pipeline expansion will be fed by a 3.5-mile Columbia Gas pipeline under the Potomac River. There are three phases to the Eastern Panhandle Expansion project: Phase One runs a 22.5-mile, 10-inch-diameter steel pipeline from Morgan County to Martinsburg; Phase Two includes a loop to Charles Town; and Phase Three will build a four mile segment of pipeline into Martinsburg. Phase One began construction in March (see
The Martians and their allies have attacked once again. Run for the hills! This is a long-running story that’s just taken another (unfortunate) twist. A handful of anti-drilling parents from the Mars School District (“Martians”) in Butler County, PA, backed by money and legal help from Philadelphia Big Green groups THE Delaware Riverkeeper and the Clean Air Council, have filed frivolous lawsuit after frivolous lawsuit (see 
At various points over the past year or so, Sunoco Logistics, in using underground horizontal directional drilling (HDD) for the Mariner East 2 pipeline project, has negatively affected some private water wells. A dozen private wells were affected by ME2 work in West Whiteland Township, in Chester County, last summer (see 
The “best of the rest”–stories that caught MDN’s eye that you may be interested in reading: Chesapeake leaving OH, but not done drilling yet; IOGA WV chief says future natgas prices flat; Rochester, NY industrial park celebrates converting from coal to natgas; national rig count down by 4, 3 of them in WV; high paying Utica jobs for the taking; NC county considers voting against MVP pipeline; new national natgas coalition forms; what to expect in natgas usage by power plants in August; and more!