ARCH2 Hydrogen Hub Gets an Official Headquarters in Morgantown, WV
Earlier this month, MDN told you that the Appalachian Regional Clean Hydrogen Hub (ARCH2) has officially received its first $30 million from the Bidenistas (see EQT & Others Enter “Phase 1” of Hydrogen Hub; DOE Cuts $30M Check). ARCH2 is getting $925 million from a $7 billion pot created by the Bidenistas. ARCH2, one of seven projects to win approval, was selected specifically because it will use Marcellus/Utica shale gas as the feedstock to create hydrogen. From the beginning, the ARCH2 initiative was led by West Virginia, so it was fitting that yesterday, at the official kickoff, a ribbon was cut on the official project office for the project, located at the West Virginia University (WVU) Innovation Corp. center in Morgantown, West Virginia.
Read More “ARCH2 Hydrogen Hub Gets an Official Headquarters in Morgantown, WV”

With all of the hoopla at yesterday’s ribbon cutting in Morgantown, WV, for the new Appalachian Regional Clean Hydrogen Hub (ARCH2) headquarters, we thought it appropriate to share a couple of studies analyzing whether and how existing natural gas infrastructure (pipelines) and appliances (furnaces and stoves) can use the hydrogen that will get produced by ARCH2. Three weeks ago, we noticed a study published by U.K. utility company National Gas that announced results from an experiment it had conducted that showed its pipeline system could be converted to flow 100% pure hydrogen, which was a shocker for us. Then, last week, a U.S. study was published, largely led by members of the Environmental Defense Fund (EDF), that reports the opposite — using existing natgas pipelines to flow 100% pure hydrogen is “mostly unusable” and won’t work. Which study is right? Because they both can’t be right.
Dominion Energy plans to build four small “peaker” electric generating plants in Chesterfield County, VA, near Richmond (see
Five months ago, the New York Senate passed a bill already passed by the Assembly to ban the use of carbon dioxide in shale drilling (so-called “CO2 fracking”). Democrat Gov. Kathy Hochul, a reliable anti-fossil fueler, has still not signed the bill into law. What the heck is going on? A small group (seven, by our count) of environmentalist wackos turned up outside the main gate at the just-opened New York State Fair in Syracuse yesterday to hold signs and protest to remind Hochul she needs to do their bidding. 
Venture Global’s Calcasieu Pass LNG export facility received Federal Energy Regulatory Commission (FERC) authorization to place the final three liquefaction blocks (7-9) into service in November 2023 (see
OTHER U.S. REGIONS: NextDecade withdraws FERC application for Rio Grande CCS project; NATIONAL: Top U.S. oilfield firm Halliburton hit by cyberattack; At the DNC, the Left’s climate solutions are worse than the problem; Why oil is down by nearly 10% in 2024 and sliding; INTERNATIONAL: World’s first AI drilling engineer is currently in training; BP economist says OPEC+ has limited scope to restore oil output; India bets its energy future on coal.