MPR Building New Sand Storage Along Ohio River in Belmont County
Here’s a neat company we haven’t written about in 4 1/2 years: MPR Supply Chain. It’s a family-owned and operated riverfront transloading facility located in Bellaire, Ohio, at mile markers 92.5 and 93.7 on the Ohio River. MPR’s facility is a Gateway Distribution Point, located minutes from major north-south and east-west transportation routes and within 24 hours of two-thirds of the population of both the United States and Canada, including some of the largest material-consuming regions in the country. MPR moves a LOT of frac sand for the Marcellus/Utica industry through its facility, and has been for 10 years. MPR just broke ground on an expansion. Read More “MPR Building New Sand Storage Along Ohio River in Belmont County”

Ohio House Bill (HB) 170, which authorizes Carbon Capture and Storage (CCS) by injecting captured CO2 into subsurface “pore space,” passed the Ohio House and has advanced to the Ohio Senate. The bill establishes a state regulatory framework, delegating to the Ohio Department of Natural Resources (ODNR) the authority to govern Class VI injection wells. This bill, if it becomes law (as seems likely), has significant implications for both drillers and landowners.
Vallourec Star, a steel pipe manufacturer in Youngstown, OH, serving the shale and other industries, was approved yesterday by the Ohio Tax Credit Authority for a seven-year job creation tax credit. It means the company will create 40 new full-time positions. The tax credit supports Vallourec Star’s plan to expand its current operations to manufacture a new line of high-quality steel pipe. 
Last week, the Baker Hughes U.S. national rig count added rigs for a second consecutive week, bringing the national count up by two to 550. Despite last week’s rig increase, the total count was still down 35 rigs, or 6% below this time last year. Rigs in the Marcellus/Utica remained the same last week at a combined 37 rigs, the same number for four weeks in a row. Pennsylvania remained unchanged at 17 active rigs. Ohio was the same at 13 rigs. And West Virginia maintained its 7 rigs, which it has operated since May 30. The Marcellus had 23 rigs and the Utica 14.
For the week of October 13 – 19, the number of permits issued to drill new wells in the Marcellus/Utica increased significantly from the previous week. There were 37 new permits issued across the three M-U states last week, up dramatically from the 7 issued two weeks ago. We can’t remember the last time we saw 37 (or more) permits issued. It’s been a looong time (months, at least). Pennsylvania issued 19 new permits. Ohio issued 13 permits. And West Virginia, which had been skunked with no new permits for three consecutive weeks, finally woke up last week (it’s woke!), issuing 5 new permits.
We happened across a lawsuit we didn’t know about, involving an issue we’ve seen before. A landowner in Belmont County, Ohio, filed a lawsuit in June 2024 alleging that Gulfport Energy, in a joint development agreement with EQT (the lease owner), drilled three wells under the landowner’s property that tapped into the Point Pleasant formation, which sits immediately below the Utica. The landowner said the lease only allows drilling in the Utica and Marcellus and NOT in the Point Pleasant.
In August, Marietta, OH, officials, including the city’s Republican mayor, law director, water superintendent, and a majority of city council members, asked the Ohio Department of Natural Resources (ODNR) Oil and Gas to deny a permit application from DeepRock Disposal Solutions for the Stephan #1 injection well, which would be the company’s fifth injection well in the area (see
The U.S. Army Corps of Engineers has proposed new permitting processes in West Virginia and Ohio that would allow certain fossil fuel projects to be built through wetlands and streams without a public comment opportunity. The proposals would allow mines, natural gas pipelines, hydropower dams, and other energy infrastructure projects in WV and OH to proceed using two simplified permits: “letters of permission” and “regional general permits.” For these projects, water pollution impacts must be limited to 2 acres or less for a letter of permission and 1 acre or less for a regional general permit. This action has the potential to speed up new natural gas pipeline projects in the Marcellus/Utica region.
Earlier this morning, National Fuel Gas Company, a large utility company headquartered in the Buffalo, NY area with both upstream and midstream subsidiaries (Seneca Resources and NFG Midstream), announced a deal with CenterPoint Energy to acquire CenterPoint’s Ohio natural gas utility business (CNP Ohio) for $2.62 billion. The deal includes 5,900 miles of distribution and transmission pipelines and serves approximately 335,000 residential, commercial, industrial, and transportation customers that consume approximately 60 Bcf of natural gas per year. The deal significantly increases NFG’s gas utility customer base, from roughly 750,000 to well over 1 million.
Ohio Democrat House members have introduced a bill to solve a problem that doesn’t exist. House Bill (HB) 399 would ban fracking under Lake Erie (which has NEVER been proposed or even thought of), and ban fracking under state-owned parks, which is now happening. With respect to drilling under (not on) state-owned parks, when it happens, nobody knows it’s happening (see
Infinity Natural Resources (INR), headquartered in Morgantown, WV, focuses 100% on the Marcellus/Utica. The company went public earlier this year with a $265 million ($20/share) initial public offering, giving INR a $1.18 billion market capitalization (see