Transco Southeast Energy Connector in Alabama Now Live for M-U Gas
Yesterday, pipeline giant Williams announced the successful commissioning of two Transco pipeline projects that can flow Marcellus/Utica gas to the southeast and Gulf Coast. The Southeast Energy Connector in Alabama supports the conversion of electric power generation in Alabama from coal to natural gas. It provides 150 MMcf/d of natural gas to meet the area’s clean energy needs. The Texas to Louisiana Energy Pathway along the Gulf Coast expands Transco’s capacity in Texas and Louisiana by 364 million cubic feet per day (MMcf/d) to support reliability and diversification of energy infrastructure along the Gulf Coast, namely for LNG exports. Read More “Transco Southeast Energy Connector in Alabama Now Live for M-U Gas”

Last week, MDN told you about three (so far) proposed Utica/Marcellus gas-fired power plants proposed for the New Albany International Business Park in Licking County, Ohio (see
The Baker Hughes U.S. national rig count lost one rig last week (after gaining one the week before), now operating 592 active rigs. As for the Marcellus/Utica, the rig count was a combined 35 last week. However, there was a notable change in the totals. Rigs focused on the Marcellus were down by one to a combined 23 across the three M-U states of Pennsylvania, West Virginia, and Ohio. Rigs focused on the Utica picked up the lost Marcellus rig, now at a combined 12. PA had operated 15 rigs (or more) for 19 weeks straight. That streak was broken last week when PA lost a rig. OH had operated nine rigs for 16 weeks in a row but picked up one last week and now stands at ten active rigs. WV had operated 10 rigs for an astonishing 23 weeks in a row. Six weeks ago, WV added (and has kept) one additional rig and operates 11 active rigs.
On Monday, the U.S. District Court for the Western District of Virginia (Roanoke Division) ruled in two of five cases before it in which Mountain Valley Pipeline (MVP), which is now majority-owned by EQT Corporation, sued radical protesters who blocked the construction of the pipeline in Roanoke County, Virginia. The court dismissed one count in the two cases (count #4) against the protesters, which the media focused on. The media doesn’t want to talk about the fact that there are five other counts, far more serious than the dismissed count, that the court is allowing to advance. These protesters are in a world of legal hurt over their illegal blocking of MVP construction. 
Never in our wildest dreams did we think that Donald Trump winning a second term would result in the resurrection of the 124-mile Pennsylvania-to-New York Constitution Pipeline project. Yet, that prospect appears increasingly likely. We don’t want to offer false hope, but we can’t ignore the signs favoring the Constitution’s springing back to life. The latest sign? Two prominent leftwing mainstream media outlets, none other than the Washington Post and POLITICO, ran stories yesterday all but admitting that the liberal Democrat governors of New York and New England are in the process of caving and either have or soon will support the Constitution Pipeline project. It’s absolute magic!
Here’s a lawsuit we were unaware of, even though it’s been playing out for years. It’s quite complicated. On the surface, at a very basic level, Cardinal Midstream II (we assume a subsidiary of the Dallas-based
Big Green is alarmed that New York Governor Kathy Hochul trooped to The White House last Friday to have a private, off-the-record conversation with President Trump about a laundry list of things, but two primary items: the Constitution Pipeline and a tax on driving in parts of Manhattan during certain hours (called “congestion pricing”). Nobody is saying anything about the meeting, but the implication is that perhaps Hochul and Trump were engaged in “horse swapping”—Trump bends on congestion pricing if Hochul bends on allowing (even endorsing) the Constitution Pipeline. The prospect of Hochul caving on the Constitution has set the environmental left’s hair on fire.
This is a sweet victory for our side. Last summer, MDN told you about a lawsuit being heard to hold Big Green groups (namely Greenpeace) responsible for their actions. Energy Transfer (ET), the owner and operator of the Dakota Access Pipeline (DAP), sued Greenpeace and other alleged instigators for $300 million for the damages sustained by the company due to violent protests incited by the groups in North Dakota in 2016 (see
Pipeline giant Williams, owner and operator of the mighty Transco pipeline system, deployed its top executives to speak at last week’s CERAWeek by S&P conference in Houston. On hand at the event were CEO Alan Armstrong, VP of New Energy Ventures, Jaclyn Presnal, and VP of Environmental, Regulatory and Permitting, Mark Gebbia. The three made a strong case that permitting reform is urgently needed if the country wants to deploy more natural gas for power generation and data centers.
Last Friday, New York Governor Kathy Hochul went to The White House for a private one-on-one meeting with President Trump. Among the topics discussed was the Constitution Pipeline project (see
National Fuel Gas Company (NFG), headquartered in Buffalo, NY, is the parent company for Marcellus/Utica driller Seneca Resources and the parent of midstream company NFG Midstream (and subsidiary Empire Pipeline). In November 2023, MDN first reported on NFG Midstream’s Tioga Pathway project, an estimated $90 million modernization and expansion project that will add 190,000 Dth per day (190 MMcf/d) of firm transportation takeaway capacity from northwest Tioga County, Pennsylvania (see 