Antis Convince Rockland County, NY Legislators to Oppose Pipe Proj.
The Algonquin Gas Transmission pipeline (owned by Enbridge) transports up to 3.09 Bcf/d through a pipeline that is 1,131 miles long. Algonquin connects to Texas Eastern Transmission (TETCO), Millennium Pipeline, and Maritimes & Northeast Pipeline and supplies New England with critically needed natural gas supplies for power generation and consumer use. As we told you in September 2023, Enbridge conducted an open season to gauge interest in expanding Algonquin’s capacity to flow more gas into New England—mainly from the Marcellus/Utica—called Project Maple (see Enbridge Open Season to Expand Algonquin Pipe in New England). Since that time, anti-fossil fuel nutters (like Food & Water Watch, Sierra Club, and others) have mounted a coordinated attack against the project (see our Project Maple stories here). Here we are, almost two years later, and the antis finally have a sliver of support—from the emasculated legislators of Rockland County, NY. Read More “Antis Convince Rockland County, NY Legislators to Oppose Pipe Proj.”

It is “The Art of the Deal” with Donald J. Trump. Only DJT could pull off such a miracle. We are referring to a deal just struck (on Monday) with New York Governor Kathy Hochul. Trump will allow New York to blow $5 billion on an idiotic offshore wind project (off the coast of Long Island) in return for Hochul allowing the construction of two long-stalled pipeline projects: The Constitution Pipeline and the Northeast Supply Enhancement (NESE) Project, part of the Transco pipeline system. We had no idea NESE was on the table as part of a potential deal!
The U.S. national rig count lost two more rigs last week, going from 578 to 576, tying January 24th of this year as the lowest national rig count in the past 12 months. Rigs targeting the Marcellus layer remained the same with 25 rigs last week, while the Utica (in Ohio) picked up one rig and now operates 11 rigs for a combined total of 36. Pennsylvania was static with 18 rigs, Ohio moved up from nine to ten rigs, and West Virginia remained the same with eight rigs.
Last November, MDN brought you the great news that MPLX (aka MarkWest Energy) would file to build an expansion at its existing Harmon Creek facility in Smith Township, Washington County, PA (see
In February, President Trump signed an executive order (EO) creating the National Energy Dominance Council, directing the new council to move quickly to increase domestic oil and gas production (see 



During last week’s first quarter update from Williams, management announced a new project called the Transco Power Express expansion. The project will expand Transco capacity by a whopping 950 MMcf/d (nearly a full Bcf) to flow more Marcellus/Utica molecules to the power-hungry Virginia market. The Virginia market is power hungry because of the data centers already built there, and the many more planned for the state. The Power Express project, if built, is expected to go online in the third quarter of 2030 (five years from now).
Dominion Energy and its operations in Chesterfield County, Virginia (near Richmond) are in the news again, but not for the same reason you may think. We previously told you about Dominion’s project to build a “peaker” electric generating plant in Chesterfield (see
Compressor Station 165 in Pittsylvania County (in southern Virginia) is part of the Transco pipeline network, the nation’s largest-volume interstate natural gas pipeline system. CS 165 is also the endpoint of the Mountain Valley Pipeline, which carries 2 Bcf/d of natural gas from the Marcellus and Utica Shale from Wetzel County, WV, to Pittsylvania County, VA. Williams, the owner of Transco, replaced an aging fleet of engines at CS 165 with new turbines that decreased emissions and took up far less space. Enbridge, another major midstream company, is replacing hundreds of flow meters with newer models, which deliver much better information to the company in real-time.